Posts Tagged ‘fracturing’

Panel to hold forum on drilling preparedness

Pa. Senate committee hearing on gas drilling will be held June 29 in Harrisburg.

STEVE MOCARSKY smocarsky@timesleader.com

The state Senate panel that oversees emergency preparedness in the state will hear testimony later this month on how ready responders are to handle catastrophes related to natural-gas drilling.

Sen. Lisa Baker, chairwoman of the Veterans Affairs and Emergency Preparedness Committee, said in a press release that community groups and environmental activists are questioning whether plans to deal with well blowouts, leaks and spills are in place and detailed enough to meet the challenges posed by the increased drilling activity in the Marcellus Shale.

Baker, R-Lehman Township, said those concerns warrant the attention of lawmakers.

“Community safety, public health and water quality are put at risk if there are any holes in emergency planning. With government budgets at every level under severe strain, it is a legitimate worry that preparation and training have not kept pace with the need,” Baker said.

In the wake of a recent natural gas well blowout in Clearfield County, Baker said there are local rumblings that the Pennsylvania Emergency Management Agency was “either not ready or not properly engaged.

“There is a responsibility to air the situation and find the facts,” Baker said.

Aaron Shenck, executive director of the committee, said he also believes state emergency officials were not notified until several hours after the well explosion, which took about 16 hours to contain.

Shenck said a representative of PEMA and the state fire commissioner will testify at the June 29 public hearing. Baker’s office also will invite representatives from the state Department of Environmental Protection and state police.

Baker said she is equally concerned about emergency preparedness at the local level.

“The heavy truck traffic resulting from equipment and fracking (hydraulic fracturing) material being shipped in raises the possibility of collisions, turnovers and spills. We are dealing mostly with rural areas and small communities. What is the state of readiness? Is there the necessary coordination and communication between levels of government before we are tested by crisis? Are the resources immediately available when the worst happens?” Baker said.

To present testimony from a more local perspective, representatives of the County Commissioners Association of Pennsylvania, the Keystone Emergency Management Association and the Lycoming County Task Force on Marcellus Shale also will be invited, Shenck said.

Lycoming is the only Pennsylvania county in which Marcellus Shale drilling is taking place that has a task force specifically designed to address drilling-related emergencies, Shenck said.

At least one representative of the natural gas industry also will be invited to testify, Shenck said.

Copyright: Times Leader

Gas-leased land borders dam

By Steve Mocarsky smocarsky@timesleader.com
Staff Writer

 LEHMAN TWP. – Back Mountain residents and local legislators knew parcels of land leased to natural gas companies for exploration were close to two major water sources – the Huntsville and Ceasetown reservoirs, but some had no idea just how close.

There is at least one parcel of leased land on the shoreline of the Huntsville Reservoir, and another parcel just a few hundred feet from the shoreline, The Times Leader learned on Monday.

The discovery was made by title searcher Eric Gustitus, of Exeter, and verified by the newspaper through a Luzerne County property records check.

“I was doing a title search on property next to Penn State Lehman and I came across a gas lease on land close to the reservoir. I was shocked,” Gustitus said, explaining that he heard local activists expressing concerns about potential gas well sites being within a mile or two of water sources.

Gustitus located a 3.72-acre property on the shoreline of the reservoir owned by Paul and Janet Siegel, and an adjacent 10.88-acre property to the west owned by their son, Christopher Siegel, and his wife, Maureen.

“Oh my God, am I concerned,” said state Rep. Phyllis Mundy, D-Kingston, when told of the proximity of the leased land to the reservoir.

“I’m very concerned about the potential for drilling so close to the reservoir. If you’ve been following the news about Clearfield County and how frack water spewed from the well for 16 hours, you can see why potential for contamination of our water supply is of grave concern to me. And I know my constituents are concerned,” Mundy said.

A blowout at a natural-gas well in Penfield shot explosive gas and polluted water as high as 75 feet into the air last week before crews were able to tame it more than half a day later.

EnCana Oil & Gas plans to drill two exploratory wells this summer – one next month in Fairmount Township and another in Lake Township. After drilling an initial vertical well on a site, the company will drill horizontally, using a process called hydraulic fracturing (fracking) to release natural gas from the thick layer of shale about a mile beneath the earth’s surface.

Mundy is a co-sponsor of legislation that would create a 2,500-foot buffer around water sources such as the reservoirs to protect them from possible contamination from gas drilling-related activities.

The Huntsville and Ceasetown reservoirs serve as a water supply for Pennsylvania American Water Co., which serves many of Mundy’s constituents.

Mundy said Pennsylvania American President Kathy Pape had expressed concerns to her about water contamination.

Pape said on Monday she is working with Mundy to prepare testimony for the state Public Utility Commission on Marcellus Shale drilling.

Harveys Lake resident Michelle Boice, a member of the Gas Drilling Awareness Coalition and a commentator on environmental issues related to gas drilling at local meetings, said allowing any kind of gas drilling operations so close to the reservoir is “beyond any kind of reasoning., and it goes to show there are no rules or protections in place for the people.”

Dr. Tom Jiunta, a founding member of the coalition, said it’s “insane how close they are with these leases” to water sources.

Paul Siegel said he’s just as concerned as his neighbors about the potential for reservoir contamination, and that’s why there’s a protective clause in his lease with EnCana. “We have the right not to let them on our land, and we wouldn’t do that because we want to live here,” he said.

Siegel said he agreed to lease the land because he got the impression that everyone around him was signing gas leases.

“When everyone around you is signing, it gets kind of like a mad rush. So, if they’re going to be drilling next to us, and they’re going to be down there anyway, we said we don’t mind if they go under us,” Siegel said.

Christopher and Maureen Siegel could not be reached for comment. Neither could EnCana spokeswoman Wendy Wiedenbeck.

To view this article, click here.

Copyright: The Times Leader

Pa. stops company’s drilling after accident

The order against EOG Resources Inc. will remain in place until DEP can finish its investigation.

MARC LEVY Associated Press Writer

HARRISBURG — Pennsylvania regulators halted work Monday at dozens of unfinished natural gas wells being drilled by the company whose out-of-control well spewed out explosive gas and polluted water for 16 hours last week.

The order against Houston-based EOG Resources Inc. will remain in place until the Department of Environmental Protection can finish its investigation and until after the company makes whatever changes may be needed, Gov. Ed Rendell said.

The order stops EOG from drilling and hydraulically fracturing wells. It affects about 70 unfinished EOG wells into the gas-rich Marcellus Shale formation.

Another concern was the apparently bungled attempts to notify the right emergency-response officials about the accident. Fines are likely, said Environmental Protection Secretary John Hanger.

Nobody was hurt in Thursday’s blowout in a heavily forested section of north-central Pennsylvania.

The accident shot highly pressurized gas and wastewater as high as 75 feet. The gas never caught fire, but state officials had worried about an explosion and ordered electrical service to the area cut before specialists secured the well at about noon Friday.

About 35,000 gallons of wastewater have been pumped into holding tanks so far, the company said.

Monitors in a nearby spring show signs of pollution, although Hanger said the spring is in such a rural area that it is not viewed as a public health hazard. Officials say they have detected no pollution in larger waterways that feed public water supplies.

The state says the company is cooperating and is supportive of the stop-work order.

Gary L. Smith, vice president and general manager of EOG’s Pittsburgh office, said the company regrets the accident and would continue to work with Pennsylvania officials.

“After the investigations are complete, we will carefully review the findings with the goal of enhancing our practices,” Smith said.

“When all outstanding issues are resolved, we look forward to resuming full operations in Pennsylvania,” Smith added.

DEP officials said the well’s blowout preventer failed, and they were investigating whether the failed equipment was the primary cause.

A blowout preventer is a series of valves that sit atop a well and allow workers to control the pressure inside.

Hanger and EOG said the blowout preventer had been tested successfully by the company on Wednesday morning.

Copyright: Times Leader

Carbondale agency advances plans for natural gas rail depot

By Steve McConnell (Staff Writer)
Published: June 2, 2010

CARBONDALE – Plans to develop an extensive railroad facility to serve the natural gas industry in Fell Twp. moved forward Tuesday.

The Carbondale Industrial Development Authority unanimously approved a motion to allow Honesdale-based Linde Corp. to purchase a nearly two-acre parcel in the Enterprise Drive business park. The company intends to use it for unloading materials from railcars for shipment via truck. It also would include storage facilities and on-site processing of drilling fluids.

The company is currently developing an adjacent property, purchased from the local railroad authority, that is part of its overall plan to have a suitable staging area for on-site processing of drilling fluids and a railroad facility capable of serving the industry, said company Vice President Christopher A. Langel.

Authority Chairman Bob Farber said there has been ambiguity as to what exactly Linde Corp. intends to develop on the new property since the company has been meeting with the board about it.

“You’ve never given us site plans,” Mr. Farber said.

Mr. Langel said the company has submitted plans and has been meeting with the board since at least October about the project.

Among plans discussed Tuesday, existing railroad tracks, which run through the heart of the city, will be extended to enable off-loading of materials at the site.

The company, which has invested more than $500,000 in the so-called Carbondale Yards Bulk Rail Terminal, is also partnering with Houston-based Baker Hughes to mix sand, water and chemicals into a concentration needed for prospective natural gas drilling sites in the area.

Mr. Langel described it as a nontoxic mixture.

The company also is eyeing the former Wells Cargo building, a large-scale facility inside the business park, as an additional storage and distribution point related to the overall operation, Mr. Langel said.

The authority board tabled a motion that would give Linde Corp. permission to purchase and develop the Wells Cargo property.

In addition, the company is in negotiations with the Susquehanna River Basin Commission to withdraw water from the Lackawanna River for potential use by the natural gas industry. The industry needs an abundance of water to help bust open underground rock formations to release natural gas, a process called hydraulic fracturing.

City administrators have said they support the project for its job-creation potential. It is expected to be completed by the end of the month.

To see this article, click here.

Copyright:  The Scranton Times-Tribune

Response to gas disaster in the works

A company drilling for natural gas says it is already working with local officials.

STEVE MOCARSKY smocarsky@timesleader.com

Although the community at large hasn’t been privy to it, some local emergency management officials have been working closely with an energy company to draft emergency response plans to address any local natural gas drilling-related catastrophe that might occur.

EnCana Oil & Gas USA is slated to begin drilling a well at a site in Fairmount Township in about a month, and many local residents, officials and emergency responders have become anxious, feeling left-in-the-dark about whether local emergency responders have the equipment, knowledge and protocols in place to handle a drilling-related catastrophe.

But Wendy Wiedenbeck, public and community relations advisor for EnCana, said local firefighters would not be responsible for containing or fighting a gas well fire or gas release at a well site.

“In the event of an incident, local emergency responders will be asked to provide support to our operations personnel who are specially trained to deal with incidents at oil and gas locations,” Wiedenbeck said.

“Should a serious well-control incident occur, such as release of gas or fire, EnCana will look to local emergency responders to provide support while EnCana calls upon well-control experts to assist in addressing such an incident,” she said.

The well-control company EnCana has identified in an Emergency Response Plan submitted to the state Department of Environmental Protection is Wild Well Control in Houston, Texas. A second call would be placed to Cudd Well Control, also in Houston.

“Depending on the severity of the well-control issue, they would respond as soon as possible. In the meantime, the area around the well – the exact area again depends on the well-control issue – would be secured and/or evacuated. This is another example of how Encana and local emergency responders will work together,” Wiedenbeck said.

Wiedenbeck said Encana has experienced well-control incidents in the past, and the risks are inherent in the oil and natural gas industry.

“Our training, systems, and protocols are designed to fit the level risk associated with the activity. Our goal is to minimize the risk and to operate in a safe manner. Safety is our number one priority,” she said.

County office works on plan

Steve Bekanich, coordinator of the Luzerne County Emergency Management Agency, said last week that he has had several conversations with EnCana officials, but a volunteer with the county EMA “has taken the lead for my office. … We are close to completing an emergency response plan.”

Bekanich said Barney Dobinick, who is also the EMA coordinator for Lake Township, is “handling all direct talks with EnCana for ease of operations. He’s briefing me almost on a daily basis. … I’m very comfortable with what Barney has been doing. He’s been a trusted staff member for 20 years.”

Dobinick said a 230-page set of response guidelines is near completion. After meeting with EnCana representatives in mid-June, the plan will be shared with area municipal officials for their approval and made available to the public. Sometime in the next few, a public meeting also will be scheduled to gather input and answer questions.

Until the plan is complete, Dobinick said it would be counter-productive to release any aspects of it until EnCana has reviewed it and possible changes are made.

“If we determine there’s a better way, we’ll amend it. We’re not hiding anything. We just want to have a complete plan in place (before it’s released),” he said.

Bekanich said adjustments can be made even after the plan is disseminated to municipal officials and input is gathered from the public.

Dobinick did say, however, that local emergency responders would handle some emergencies at well sites, for example, a brush fire, an office trailer or vehicle fire or a hazardous materials spill.

Jack Dodson, emergency management coordinator for Dallas Township and Kunkle fire chief, has said his major concern was having emergency personnel who might have to extract disaster victims from a well-related catastrophe prepared to do so.

Dobinick said there are response guidelines for mass-casualty incidents, getting basic and advanced life support on-scene and implementing a disaster plan for hospitals and medical air transport.

“And depending on the seriousness of an event, it would determine how much, if any, of an area would be evacuated,” Dobinick said.

Off-site also part of concern

Dobinick said he’s more concerned about local responses to off-site incidents, such as the crash of a truck carrying “residual backflow” material, or “frack water” used in the hydraulic fracturing of the Marcellus Shale formation.

He said fire departments would handle the initial stabilization of such an incident and work to prevent contamination of any nearby waterway. A state-certified hazardous material clean-up team would come in if needed to remove the material and any contaminated soil.

Dobinick said he feels “very comfortable” with the guidelines and hopes to have the majority of the document complete by the end of the week. He’s still waiting on some information from the county 911 office and the American Red Cross.

Plus, Bekanich noted that Luzerne County is a member of and has access to the resources of the East Central Pennsylvania Regional Task Force – a seven-county all-hazards task force formed in 1998 along with eight other such task forces in the state in response to terrorist threats.

Bekanich said 48 professionals from Luzerne, Wyoming, Schuylkill, Colombia, Northumberland, Montour and Berks counties attended a training event/exercise last week at the county EMA headquarters and worked on a scenario to determine “how we would bring logistics and resources together for an event such as a catastrophic well failure.”

If a catastrophe did occur, Bekanich said, “it’s not like we would be in this on our own. We have resources and technical expertise from seven other counties to rely on for support.”

Dobinick also said EnCana has commissioned a transportation study and will be sitting down with officials from the Lake-Lehman School District to address any concerns about incidents that could affect school bus routes.

Several area residents have voiced concerns about emergency response and traffic at public meetings over the last few months and have been dissatisfied with information supplied by EnCana.

Company schedules meetings

Wiedenbeck said meetings with stakeholders are scheduled for this week.

“Our goal is to understand how these agencies work together, how our operations impact them and how we can work together to make sure we collectively work together so local emergency responders continue to do the great job they’re already doing,” Widenebeck said.

The purpose of sitting down with Dobinick and others is to determine the capabilities of local responders and “if there are gaps, how do we fill them.”

In some instances, Wiedenbeck said, there might be grants available to purchase emergency response equipment that might be needed – for example, a new radio system.

“Our job is to work together with emergency responders, the recreation district, township supervisors and the school district to understand existing protocols and how those protocols might be impacted if there is an incident. We also need to understand existing resources, identify potential gaps and solutions for addressing the gaps, if any,” Wiedenbeck said.

Steve Mocarsky, a Times Leader staff writer, may be reached at 970-7311.

Copyright: Times Leader

Extra protection in place for water amid drilling

The Susquehanna River Basin Commission has a set of rules for gas companies.

STEVE MOCARSKY smocarsky@timesleader.com

The Department of Environmental Protection isn’t the only state agency intent on protecting water sources from natural gas drilling activities that could affect area residents.

Tom Beauduy, deputy director of the Susquehanna River Basin Commission, said the commission requires drilling companies to account for “every gallon of water” withdrawn from any water source within the basin – where it comes from, where it’s used and what happens to it after it’s used.

And, a $1 million water quality monitoring system is being put in place near drilling sites within the basin, Beauduy said.

Beauduy said Marcellus Shale development in Pennsylvania hit the commission “like a tsunami,” just like it did every other impacted agency in the state.

The natural gas industry uses 4 million to 6 million gallons of water per natural gas well to release gas from the shale in a process called hydraulic fracturing, or fracking. Currently, the industry is using about 1 million gallons per day in the state, and Beauduy expects that amount to increase to 28 million a day.

The commission, which is responsible for water resources planning, management, conservation, development, use and allocation, responded quickly to the industry’s needs. Protocols were adjusted so the commission could deal with the surge of water allocation requests, but no corners are cut when granting water withdrawal approvals, Beauduy said.

All companies known to be drilling in the Marcellus Shale region, which underlies more than 72 percent of the Susquehanna River Basin, were notified of the commission’s regulatory requirements. And the commission activated a previously unused rule that authorized an administrative “approval by rule” process for water withdrawals solely from public water supplies.

To date, Beauduy said the commission has approved 111 surface water withdrawals, with 55 applications pending; and 22 approvals of public water supply withdrawals, with 14 pending. It has also issued 662 approvals by rule for individual well pad sites and has 181 pending.

While the amount of water the gas industry needs might seem massive, Beauduy pointed out that the golf and ski resort industry in Pennsylvania consumes an average of 56 million gallons per day. He said industry needs can be accommodated if regulated properly. The industry must abide by restrictions that prevent negative impacts on streams and rivers that could harm aquatic life and water quality.

And while DEP regulates how the industry must dispose of flowback water from fracking operations, the commission will track area rivers and streams to catch a contamination problem.

The commission will have 30 water quality monitoring stations set up by the end of June in the regions where drilling in the Marcellus Shale is most active, as well as other locations where no drilling activities are planned so the commission can collect control data. The monitoring network will provide constant data collection with instruments sensitive enough to detect subtle changes in water quality on a frequency that will allow background conditions and any changes to them to be documented throughout the year.

Each monitoring station will be equipped with water quality sensors and a transmitter to continuously monitor and report water temperature, pH, dissolved oxygen, ability to conduct electricity (conductance) and water clarity. The water depth also will be recorded to establish a relationship with stream flows.

The monitoring of conductance is key to detecting impacts associated with natural gas activities if they occur because water produced by the natural gas industry is generally 200 times more conductive of electricity than water normally measured in streams in the basin.

The monitoring network, the data from which will be accessible online by the public, will provide early warnings to help DEP officials respond more rapidly and better pinpoint causes if water quality conditions change. It will also help local public water suppliers, local watershed groups and communities stay informed.

Steve Mocarsky, a Times Leader staff writer, may be reached at 970-7311.

Copyright: Times Leader

Company defends its environmental record

EnCana’s hydraulic fracturing has never impacted a water well, spokeswoman says.

By Steve Mocarskysmocarsky@timesleader.com
Staff Writer

Wendy Wiedenbeck acknowledges that Luzerne County residents might be troubled by the fact that EnCana Oil & Gas (USA) Inc. paid $1.5 million in fines over the past four years.

But Wiedenbeck, the community and public relations adviser for the natural gas company that will begin drilling in the Back Mountain and Red Rock areas this summer, said the company is “committed to responsible development” and today is “a leader in environmental stewardship.”

According to data Wiedenbeck provided at the request of The Times Leader, EnCana was assessed $542,000 on nine fines in 2006; $663,000 on 19 fines in 2007; $306,000 on 19 fines in 2008; and $3,000 on 10 fines in 2009. The data for 2009 is subject to change, she said.

Some Back Mountain residents and elected officials have expressed concern that drilling activities could contaminate water private water wells or the Huntsville and Ceasetown reservoirs.

Wiedenbeck said EnCana has never had an instance in which the company’s hydraulic fracturing process affected a water well.

“In fact, there has never been an instance where the fracking process impacted water wells. We have, however, experienced operational failures, which resulted in regulatory violations and fines. These range from issues with lost circulation during cementing, which resulted in permanent changes to cementing protocols in 2004, to deficiencies with location signage,” she said.

Encana’s violations have ranged a wide gamut, from a $1,000 fine after a contractor’s truck broke down on a mountain road during a restricted time period, preventing parents from picking up their children from a bus stop in 2002, to the largest fine issued by the Colorado Oil & Gas Conservation Commission for allowing gas to migrate into a creek.

The commission fined EnCana a record $371,000 after one of the company’s wells leaked into West Divide Creek in Western Colorado in 2004. The seep was found to contain the carcinogenic chemical benzene.

Wiedenbeck said that fine is included in the total assessed in 2006, and the seep resulted from a failure in cementing procedures at the well.

“We made a mistake. We moved too fast. But we worked with the commission to modify and improve the cementing procedure in Colorado. Since then, we’ve drilled hundreds of wells in Colorado without incident. But (the Divide Creek incident) is part of the reason why we’re taking a very thoughtful and measured approach to our operations in Luzerne County,” she said.

Wiedenbeck also pointed to a vast improvement in EnCana’s record related to spills.

In 2009, EnCana had 75 reportable spills totaling 4,036 barrels of material, a volume reduction of 38 percent from 2008 and 87 less than in 2007, she said.

Dave Neslin, executive director of the Colorado Oil & Gas Conservation Commission, said commission staff views EnCana as “a responsible operator.”

Neslin said EnCana’s compliance has improved since the Divide Creek seep, and the company implemented an extensive remediation plan. “Much of the impact has been remediated,” he said.

Neslin said EnCana is one of the largest operators in the state, responsible for nearly 10 percent of the approximately 40,000 active oil and gas wells in the state.

He noted that the company was the first to voluntarily establish a wildlife mitigation program encompassing 44,000 acres to ensure wildlife populations will be protected, and that EnCana won a commission award last year for the company’s Courtesy Matters community outreach program.

Steve Mocarsky, a Times Leader staff writer, may be reached at 970-7311.

Copyright: Times Leader

Water to be tested because of drilling

PA American Water Co. to sample water from Huntsville Creek near natural gas well.

By Jerry Lynottjlynott@timesleader.com
Business Writer

A water company has begun inspecting a creek flowing from the Huntsville Reservoir as a result of a permit issued for a natural gas well in Lehman Township.

PA American Water Co. also will soon begin sampling water from Huntsville Creek, company spokesman Terry Maenza said Thursday.

The testing is to check whether drilling has affected the 1.9-billion- gallon reservoir that supplies drinking water to the utility’s customers. The reservoir is in the Back Mountain area of Luzerne County where more than 25,000 acres have been leased by companies planning to tap into the natural gas rich Marcellus Shale formation underground.

Technicians will go out once a week to take water samples, said Maenza, “so we have baseline data.”

Last month township officials approved a drilling permit for EnCana Gas & Oil USA Inc. It has partnered with Whitmar Exploration Co. to locate possible drilling sites within nine townships and Harveys Lake in the Back Mountain.

PA American has two reservoirs bordered by lease holdings. The 2.9 billion gallon Ceasetown Reservoir also is located in Lehman Township. In conjunction with Huntsville, Ceasetown supplies water to 100,000 people in the Wyoming Valley, Maenza said.

The reservoirs have 500-foot buffer zones around them where drilling is not permitted, he explained.

Maenza added that the water company relies on regulators and inspectors to enforce laws related to drilling and disposal and treatment of waste water used in the hydraulic fracturing or fracking, the high pressure injection of a mixture of water, chemicals and other materials to break up the rock containing the natural gas.

The utility frequently is in contact with the state Department of Environmental Protection on a number of issues, including permits issued for drilling. “They’re letting us know about it,” Maenza said.

Two other water companies that serve customers in the Back Mountain are leaving oversight up to DEP, the Susquehanna River Basin Commission and the state Fish and Boat Commission.

Donna Alston, a spokeswoman for Aqua Pennsylvania, said existing DEP regulations provide protection for the company that draws its water from wells. The company provides service to customers in Luzerne County through its White Haven Division. Statewide it serves 1.4 million people in 30 counties.

Still, Aqua is stepping up its own efforts.

The utility “will be monitoring water quality more frequently and extensively than required by regulation whenever drilling activity is occurring anywhere near one of its well supplies to detect and respond to any water quality changes that might occur,” Alston said.

What steps United Water takes depends upon how close a natural gas well is drilled to one of its water wells, said spokesman Bob Manbeck.

“If a permit for extraction was under consideration within a one mile radius of a United Water-owned well, we would intervene in the permitting process and attempt to ensure that the extraction points are an appropriate distance from our wells,” said Manbeck.

United Water has six wells in Dallas, two each in Dallas Township and Harveys Lake and one in Noxen Township in Wyoming County. It serves 10,000 customers in the Back Mountain.

Copyright: Times Leader

Zoners OK gas drilling in Lake Township

EnCana also allowed to put in gas metering station in Fairmount Township.

By Steve Mocarskysmocarsky@timesleader.com
Staff Writer

WILKES-BARRE – The Luzerne County Zoning Hearing Board on Tuesday gave the go-ahead for a natural gas drilling operation on 6 acres of land in Lake Township and a natural gas metering station on 5 acres in Fairmount Township – under certain conditions.

EnCana Oil & Gas USA Inc. sought a 12-month temporary use permit to drill a gas well, have a water tank storage facility and park five personnel trailers on a part of a 49-acre site located at 133 Soltis Road and owned by township Supervisor Amy Salansky and her husband, Paul.

The company also sought a special exception to install a permanent wellhead on the site.

In a separate application, EnCana sought a use variance to operate a natural gas meter station within a 112-acre parcel near the intersection of Mossville and Hartman roads on property owned by Thomas and Caroline Raskiewicz, in Fairmount Township, as well as a height variance to erect an associated 150-foot radio tower on the site.

Following a presentation by EnCana regulatory adviser Brenda Listner and listening to testimony from seven members of the public who opposed the plan in a packed hearing room at the county courthouse, the board adjourned for an approximately 10-minute executive session to, according to Chairman Lawrence Newman, “discuss the conditions that would be placed on the special exception request.”

The board then voted unanimously to approve all of Encana’s requests subject to the company providing evidence of:

• Approved permits from the state Department of Environmental Protection, the Susquehanna River Basin Commission and any other mandated agency.

• Road bonding based on acceptable rates as designated by supervisors of the townships of Lake and Lehman.

• Appropriate sound controls as necessary to minimize noise.

• Light diffusion as required to divert light away from neighboring structures.

• A dust-control plan including evidence that no contaminated water or water used in the hydraulic fracturing (fracking) process would be used for dust control.

• A pollution preparedness contingency plan, an emergency response plan and other plans set forth in EnCana’s “best management practices” outlined in a memo from EnCana.

Prior to the vote, local activist Dr. Thomas Jiunta, led off a round of questions from the public. He had asked EnCana representatives if many of the plans addressed in EnCana’s best management practices were available for review.

Listner said they were still in the works or under discussion with township officials.

Jiunta wanted to know how emergency response times in the area would be addressed, given that some sections of road are 17 feet wide and the average width of fire trucks and trucks associated with drilling operations are an average of 9 feet wide. There is no room for a truck to pull off a road and yield to an emergency vehicle, he said.

Michelle Boice of Harveys Lake said she doesn’t think “there’s any emergency preparedness,” noting that there are no police or fire departments in Lake Township, and the community relies on state police and volunteers from other communities for coverage.

Copyright: Times Leader

Gas firm seeking special land uses

Parcels in Lake, Fairmount townships require county zoning approval.

By Steve Mocarskysmocarsky@timesleader.com
Staff Writer

An energy company is seeking zoning approval to temporarily locate five personnel trailers and up to 192 water storage tanks capable of holding more than 4 million gallons on a 6-acre site in Lake Township.

IF YOU GO

The Luzerne County Zoning Hearing Board will hear testimony on applications from EnCana Oil & Gas for special land uses in Lake and Fairmount townships at 7 p.m. Tuesday, in the Commissioners Meeting Room at the Luzerne County Courthouse in Wilkes-Barre.

EnCana Oil & Gas USA Inc. also wants to temporarily place a sewage holding tank and a potable water tank for each trailer at the site, all to be used during the drilling of a well to extract natural gas from the Marcellus Shale formation thousands of feet below the Earth’s surface.

The Luzerne County Zoning Hearing Board on Tuesday will hear a presentation from EnCana in connection with the company’s application for a “temporary use” and a special exception to construct a permanent gas well head facility on the 49-acre property located at 133 Soltis Road and owned by township Supervisor Amy Salansky and her husband, Paul.

EnCana also is seeking a use variance to operate a natural gas meter station on 5 acres within a 112-acre parcel in Fairmount Township, as well as a height variance to erect an associated 150-foot radio tower on the site.

The meter station site, located at the intersection of Mossville and Hartman roads on property owned by Thomas and Caroline Raskiewicz, would be used to treat and compress natural gas from another well drilling site in Fairmount Township for which EnCana has already received county zoning approval. That drilling site, located off state Route 118 between Tripp and Mossville roads, is owned by Edward Buda.

The Salansky site in Lake Township is the third in the county on which EnCana plans to begin drilling for gas this summer. Earlier this month, the company received approval from Lehman Township supervisors to drill near Peaceful Valley Road on property owned by Russell and Larry Lansberry.

The Salansky and Buda sites required county zoning board approval because neither Lake Township nor Fairmount Township has zoning regulations.

Wendy Wiedenbeck, public and community relations advisor for EnCana, said the Buda site will be the first to be drilled. The target date for drilling to begin, known in the industry as the spud date, is July 1. Crews were to begin clearing an access road on Thursday.

Wiedenbeck said the spud date for the Salansky site is expected to be about a month after drilling begins at the Buda site. It takes about a month to drill a well, and the drilling equipment will be moved from one site to the next.

Plans for the Lansberry site are still under discussion, she said.

21,000-gallon tanks

According to a narrative that EnCana included in the zoning application for the Salansky site, the company will need about 6 million gallons of water for each well completion. Completing a well requires hydraulic fracturing (fracking), which is the process of injecting a mixture of water, sand and a small amount of chemical fluid additives into the wellbore under very high pressure to fracture the shale formation and release the natural gas.

EnCana estimates about 1.2 million gallons of flowback water will return to the surface.

Fresh water for the well completions will be stored in some of the 21,000-gallon “frac water” tanks, which are about 8 feet wide, 50 feet long and 13 feet tall. Some of the steel tanks also could be used to collect flowback water, which either will be treated and reused during a future well completion or hauled away and disposed of at a permitted wastewater facility.

EnCana plans to drill one well at each site using a truck-mounted drill rig. It would be drilled vertically about 7,000 to 8,000 feet deep and then horizontally about 5,000 to 7,000 feet.

During drilling operations, sites would have a drill rig, stockpiles of drill pipe and casing, a 60-by-160-foot reserve pit with an impermeable liner for collecting cuttings and fluid, mud shakers to separate the cuttings from the fluid, generators to provide power to the drill rig and office trailers that would be equipped with personnel sleeping quarters.

Drilling activities would occur around the clock for about four weeks and require on-site supervision 24 hours a day.

Main access roads to the Salansky site include Lehman Outlet, Hoover, Sholtis, Zosh, Ides, Meeker and Slocum roads and state Route 118. EnCana will work with supervisors of Lake and Lehman townships to complete a road assessment and provide appropriate bonding for the roads.

Meter site structures

Major structures at the Raskiewicz meter site in Fairmount Township, in addition to the radio tower, include two 40-by-40-foot buildings, about 20 feet tall, that would house compressor engines, and a 15-by-35-foot meter building about 12 feet high.

Also planned is a smaller air purification building.

Two 20-foot-tall storage tanks for condensate – liquids that fall out of the gas and settle at low points in the pipeline – also will be placed there, along with various other types of storage tanks, most about 10 feet tall. There also will be a dehydration unit, mainly composed of a vertical tank about 34 feet tall.

The facility will require a 1/2 acre where a 6-inch EnCana gas line will feed into the 24-inch transcontinental pipeline that already passes through the site underground, and another 1.5 acres for placement of EnCana treating and compression equipment. The additional 3 acres is for future expansion.

Main access roads to the site are state Route 118, Mossville Road and Hartman Road.

Steve Mocarsky, a Times Leader staff writer, may be reached at 970-7311.

Copyright: Times Leader